Pular para o conteúdo principal

Aquilion 16 (TSX-101A) service procedures & guides

197 field-service procedure previews for the Canon Medical (Toshiba) Aquilion 16 (TSX-101A) — what each procedure does, tools/parts and safety. The full step-by-step lives in the FSELIB service manual.

Console (Diagnostics) · 2

Console (Operation) · 2

Console (Recon) · 2

Gantry/Rotation · 7

Couch/Control · 9

Gantry-Couch/Control · 2

Couch/Table (Longitudinal) · 6

Couch/Table (Vertical) · 7

Couch/Table (Clutch/Brake) · 1

Couch/Table · 10

Couch/Table (Covers) · 2

DAS · 13

Detector/DAS · 5

Detector temperature control · 1

Gantry — Covers & access · 9

Gantry — Optical / projector · 2

Gantry — Rotation drive · 2

Gantry — Tilt drive · 4

Gantry — Slip ring & brushes · 4

Gantry — X-ray tube · 2

Gantry — Tilt/Stand · 2

Gantry — Slip ring · 2

Gantry — X-ray beam optics · 2

Gantry — Troubleshooting · 1

Installation · 6

Gantry · 24

Bring the gantry into the scanner room15 stepsAlign the slip-ring brush assemblies10 stepsClean the large-current slip ring (LCSR)21 stepsOperational checks of gantry, couch, detector and X-ray tube18 stepsInstall optional units and mount the covers6 stepsClean dome internal-projector window and check Mylar ring mounting — 1.345 stepsGantry fan-noise check and filter cleaning — 1.44/1.456 stepsFault-current protective breaker (NFB2) operation check — 1.436 stepsGantry mounting-bolt/screw tightening checks (items 1.1-1.24, paint-mark method)4 stepsGantry rotation operation check (scan speeds) — 1.329 stepsGantry safety-mechanism and interlock checks — 1.36/1.377 stepsGantry terminal-board looseness, screw/nut, cable and final cleaning checks — 1.55-1.588 stepsVisual check of GTS unit and rotation servo unit interiors — 1.49/1.507 stepsOff-delay timer (X-ray tube cooling protection) setting and function check — 1.485 stepsOperating-panel and footswitch operation & switch-clearance checks — 1.46/1.477 stepsClean gantry photo-sensors (rotation, wedge, slit, rotational-direction detectors) — 1.255 stepsPositioning projector lamp: replacement, cleaning and internal/external/median alignment — 1.3317 stepsGantry safety-circuit operation checks via KGTSM (tilt/vertical/horizontal, runout, rotation error) — 1.38/1.39/1.4013 stepsSlipring brush abrasion check and brush replacement — 1.3014 stepsClean the large-current slip ring and adjust brush alignment — 1.2932 stepsSlit operation check (slice/slit width table) and wedge slide check & lubrication — 1.27/1.288 stepsTilt cable routing (cable movement) check — 1.353 stepsTilt power cylinder and gas spring abnormal-sound/oil-leak check — 1.265 stepsTilt limit switch check and tilt-angle adjustment — 1.316 steps

Power · 4

Recon/Console · 3

X-ray & HV · 6

Network/DICOM · 1

Gantry — Site installation · 1

Interlocks · 1

Maintenance · 2

Data Transfer (MUDAT) · 7

Software / Alignment · 2

Software / Storage & RAID · 2

Software / Backup & Restore · 2

Software / Calibration · 1

Software / DCA · 5

Software / Error Analysis · 1

Software / Installation · 4

Software / Network & DICOM · 2

Software / Options & Licensing · 3

Software / Exam Scheduler · 1

Software / System Setup · 1

X-ray & HV (X-ray tube) · 4

X-ray & HV (XC control) · 7

X-ray & HV (SRU generator) · 7

X-ray & HV (Cooling) · 1