Replace the main detector array
Replace the main detector array by locking the gantry rotation, disconnecting seven cable groups, unbolting and lifting the old 76 kg detector/DAS assembly out on a replacement jig, transferring the DAS PWB and positioning pins onto the new detector, bolting the new assembly in at the specified torque, and running the full post-swap functional checks — temperature stabilization, all-channel DCA output, NRA imaging, tube alignment, and calibration.
Tools & parts
| Item | Part number | Qty |
|---|---|---|
| Standard tool set | n/a in source | 1 set |
| Adhesive (packing) tape | n/a in source | Small amount |
| Insulated cable ties | n/a in source | Several |
Safety
Hazard: The main detector's temperature is not maintained at a certain level after the swap
Consequence: Artifacts may occur
Avoidance: Confirm the temperature controller display rises gradually and stabilizes between 36.0 °C and 38.0 °C (OT1 red lamp blinking) during the post-replacement checks before considering the detector ready — source gives no further avoidance instruction beyond this check
Hazard: Starting calibration data acquisition before the detector has had time to reach a stable operating temperature
Consequence: Not explicitly named in source; source states 2 to 3 hours are required for detector-temperature stabilization, which this wait period exists to satisfy
Avoidance: Wait at least 3 hours after system power-on before starting calibration data acquisition (2-3 hours are required for detector temperature stabilization; this may differ depending on room temperature)
Full step-by-step for Replace the main detector array
All 29 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated Detector/DAS guides
Source: 2D201-065E*D p.89-95. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.