Pular para o conteúdo principal
ProcedureGantry — X-ray tubeReplacement/FRUReplace

Replace the X-ray tube (side and bottom jig methods)

Replace the X-ray tube by locking the gantry rotation, disconnecting the high-voltage cable and tube cabling, unbolting the tube mounting plate, and carting the old tube out (and the new one in) on one of two dedicated jigs — one for pulling the tube out the side of the gantry, one for lowering it out the bottom.

Applies to
Aquilion 16 (TSX-101A)
Personnel
2 technicians · Advanced — reaching and swapping the tube means torquing M12/M8 bolts (strength category 12.9) with a torque wrench, disconnecting and reconnecting the high-voltage cable through a mandated discharge sequence (DANGER), operating a dedicated jig/cart (PX77-97050-1 for the side method or PX77-84500-1 for the bottom method) to support and move a heavy tube in or out of the gantry, transferring the tube mounting plate set and collimator block onto the new tube, and re-leveling/re-locking the rotation section around two separate bolt-removal points — exactly the crush hazard the grouped WARNING addresses. The technician must also choose the correct jig method for the tooling on hand; the two are not interchangeable mid-procedure. No calibration step is included within this section itself, but source separately notes that a rotation-balance adjustment may also be required (see Verification). (Skill assessment derived from procedure content — not an OEM-stated skill level.)
Steps
44 steps
Source
2D201-061E*H p.74-84

Tools & parts

ItemPart numberQty
Phillips screwdrivers (large and small)n/a in source1 each
Wrench set for hexagonal head boltsn/a in source1 set
Torque wrench (for M12 and M8 bolts)n/a in source1 set
Combination wire strippern/a in source1
Cable ties and clamps (large, medium, small)n/a in source30 each
Tube replacement jig — for removal from the sidePX77-97050-11 set
— Cart assemblyBX77-3067-11
— Tube base assemblyBX77-3068-11
— SRU base assemblyBX77-3069-11
— Plate3X77-970121
— Pin4X77-970143
— Boltsn/a in source4
Tube replacement jig — for removal from the bottomPX77-84500-11 set
Handles for the X-ray tube4X77-82627, 4X77-826281 each
Stepladder (at least 90 cm in height)n/a in sourceqty not stated

Safety

DANGER

Hazard: Touching the tip of the high-voltage cable

Consequence: Residual charge may cause an electric shock

Avoidance: Do not touch the tip of the high-voltage cable

WARNING

Hazard: Removing a heavy component from the rotation section without first engaging the mechanical brake (rotation lock pin)

Consequence: The gantry rotation section may rotate due to the weight imbalance created by the part's removal, possibly resulting in personal injury

Avoidance: Engage the mechanical brake (rotation lock pin) before removing a heavy component from the rotation section

DANGER

Hazard: Disconnecting the high-voltage cable without fully discharging its residual charge (both jig methods, at the return/starter-cable disconnection step)

Consequence: Electric shock during servicing work

Avoidance: Turn power OFF and wait five minutes or more; once the high-voltage cable is disconnected, simultaneously ground two of the three pins at the top of the bushing in all three combinations, repeating all combinations twice or more; do not touch the top of the bushing; place a cap or vinyl cover over the tip of the bushing to protect it

CAUTION

Hazard: Removing the X-ray tube without care while unbolting the tube mounting plate (both jig methods) — the tube may move longitudinally during the work

Consequence: (not detailed further in source for this item)

Avoidance: Be careful, because the tube may move longitudinally during this work; insert the rotation lock pin into the rotation lock pin retaining plate securely

CAUTION

Hazard: Rotating the X-ray tube on the bottom-removal jig's base before confirming it is firmly seated

Consequence: (not stated in source)

Avoidance: Before rotating the X-ray tube, be sure to confirm that it is firmly placed on the base

Full step-by-step for Replace the X-ray tube (side and bottom jig methods)

All 44 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related Gantry — X-ray tube guides

View all Aquilion 16 (TSX-101A) guides

Source: 2D201-061E*H p.74-84. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.