Preventive MaintenanceMaintenancePM
Periodic inspection schedule: full item list with 3M/6M/1Y/2Y intervals
This is the Aquilion 16's master periodic-inspection schedule (Sec. 4 of the maintenance volume): one table listing every one of the 118 checked items across all seven subsystems — Gantry, Patient couch, X-ray system, Data acquisition system, Data transfer unit, Console, and Entire system — that the periodic-inspection program covers.
Applies to
Aquilion 16 (TSX-101A)
Personnel
Varies by item — from basic visual/cleaning checks (e.g., 1.25 photo-sensor cleaning, 1.44-1.45 fan/filter, 6.1-6.6 console cleaning) to structured electronic verification via the KGTSM/PC service cable (e.g., 1.38-1.40, 1.53) to component replacement (e.g., 1.30 slipring brush, 3.14 XC battery) — see each item's own detailed atom for its specific skill level.
Steps
0 steps
Source
2Y201-061E*E p.17-20
Full step-by-step for Periodic inspection schedule: full item list with 3M/6M/1Y/2Y intervals
All 0 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated Maintenance guides
Before inspection: tools, workers, standard precautions, cleaning and disinfection8 stepsRun the console malfunction-diagnosis program (hwtest)0 stepsRun the independent MHR PWB test (diagnostics) from the RTM terminal4 stepsRemove the host PC unit (PX74-07959 GR-1/GR-2)4 stepsRemove the host PC unit (PX74-08766 GR-1/GR-2)5 stepsRemove and install an RDD disk/power-supply unit (Rorke Data)5 steps
View all Aquilion 16 (TSX-101A) guidesSource: 2Y201-061E*E p.17-20. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.