Pular para o conteúdo principal
ProcedureData Transfer (MUDAT)Functional ChecksInspect

Operation check after MUDAT work

After any MUDAT disassembly, PWB replacement, or control-data repair work, this short functional check — enabling the GCIFA's local data-acquisition switch and running the gantry through a supervised local test rotation — is how you confirm the data-transfer link comes back error-free before the system is returned to clinical use.

Applies to
Aquilion 16 (TSX-101A) — gantry data-transfer (MUDAT) section, source volume 2D201-059E*D §5.6 ("Operation Check After MUDAT Work"), p.98. Run this check after any MUDAT disassembly/PWB-removal work (§5.5, p.97) or after any control-system data-communication troubleshooting/repair (§5.2) — the troubleshooting flow's own master step, "Perform operational checks after completing work," points here.
Personnel
1 technician · Intermediate — operating the GCIFA PWB's local data-acquisition DIP switch (SW1-2) and error-clear pushbutton (SW4), running a supervised local test rotation from the KGTSM (or its maintenance-panel/terminal equivalent) for more than 2 full rotations, reading the GCIFA's red error/FAIL indication, and resetting the KGTSM afterward with SW21; no disassembly or component-level fault isolation is performed by this check itself (skill assessment derived from procedure content — not an OEM-stated skill level).
Steps
0 steps
Source
2D201-059E*D p.98

Full step-by-step for Operation check after MUDAT work

All 0 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related Data Transfer (MUDAT) guides

View all Aquilion 16 (TSX-101A) guides

Source: 2D201-059E*D p.98. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.