Pular para o conteúdo principal
ProcedureInstallationInstall

Basic disassembly and carrying-out of the system

Before a CT system can be taken out of a room, run it through this closing sequence — erase the patient data, put the gantry and couch into a locked, de-anchored, de-energized state, and only then carry it out — exactly as laid out in Section 29 ("Basic Procedures for Disassembly and Carrying-Out of the System and Related Precautions"), the last section of the Installation volume.

Applies to
Aquilion 16 (TSX-101A) — Installation volume, source volume 2C201-160, Section 29 ("Basic Procedures for Disassembly and Carrying-Out of the System and Related Precautions"), p.215-216 — the last section of the installation volume, covering the reverse of installation: taking the system out of service and carrying it out of the scanner room.
Personnel
Not stated explicitly in this section. The work spans a software-level step (deleting image/raw data and initializing the HDD), setting a specific mechanical/electrical status (gantry tilt and rotation stoppers engaged, hydraulic-couch air vents sealed, couch at the DOWN limit position, power switch OFF and power cables disconnected at the distribution board), mounting anti-rotation/anti-tilt fittings and carrying-out eyebolts, removing interconnection cables, and removing the gantry/couch anchor bolts before the system is carried out — comparable in scope to running the installation sequence documented elsewhere in this same volume (bringing-in, anchoring, cabling) in reverse. (Skill assessment derived from the section's content — not an OEM-stated skill level.)
Steps
13 steps
Source
2C201-160E*F p.215-216

Tools & parts

ItemPart numberQty
Metal fittings for preventing rotation or tiltingn/a in sourcen/a in source
Special metal fittings (eyebolts, etc.)n/a in sourcen/a in source
Testern/a in sourcen/a in source

Safety

WARNING

Hazard: Contact with spilled blood or contrast medium while disassembling and carrying out the system.

Consequence: Spilled blood or contrast medium may be a source of infection.

Avoidance: Wear hospital gloves and perform appropriate disinfection before starting work. In addition, perform thorough cleaning after the CT system has been carried out.

WARNING

Hazard: Performing system operations such as gantry rotation, gantry tilting, and couch vertical movement (to reach the carrying-out status) without first checking the surrounding area.

Consequence: Failure to check the surrounding area first may result in your becoming caught.

Avoidance: Before performing system operations such as gantry rotation, gantry tilting, and couch vertical movement, be sure to check the surrounding area to ensure safety.

WARNING

Hazard: Disconnecting the power cables from the power distribution board without first confirming, with a tester, that no power is supplied.

Consequence: Failure to do so may result in an electric shock.

Avoidance: Before disconnecting the power cables, be sure to turn OFF the breaker at the power distribution board. In addition, use a tester to confirm that power is not supplied.

WARNING

Hazard: Transporting the gantry without the tilting and rotation lock mechanisms securely engaged.

Consequence: The system may fall due to unexpected gantry tilting or rotation, resulting in personal injury.

Avoidance: Before transporting the gantry, be sure to securely engage the tilting and rotation lock mechanisms.

WARNING

Hazard: Carrying out the gantry and patient couch without reviewing the installation manual's bringing-in precautions beforehand, without pre-operation checks of the tools/instruments used (wire cables, jigs, jacks, etc.), or along a carrying-out route without sufficient clearance.

Consequence: The use of inappropriate tools or instruments may allow the system to fall, resulting in personal injury. A worker may become caught between the system and a wall, etc., during carrying-out, or have hands or fingers caught and injured.

Avoidance: Carefully review in advance the precautions described in the sections related to bringing-in in the installation manual and observe them when carrying out the system. Make arrangements with a transportation agency for transport of the gantry and patient couch. Be sure to perform pre-operation checks of the tools and instruments (wire cables, jigs, jacks, etc.) to be used for carrying-out. Ensure that the carrying-out route has sufficient clearance, and do not place your hands, fingers, etc. where they may become caught and injured.

Full step-by-step for Basic disassembly and carrying-out of the system

All 13 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related Installation guides

View all Aquilion 16 (TSX-101A) guides

Source: 2C201-160E*F p.215-216. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.