Close out the Aquilion 16 install by proving the gantry and couch don't interfere with each other under their permanent covers, exercising gantry/couch/ScanoPlan/emergency-switch operation from the console, and handing off to the 3-hour wait that gates calibration data acquisition.

Applies to
Aquilion 16 (TSX-101A) — Installation volume, source volume 2C201-160, Sections 21 through 23 ("Checking the Relationship Between the Gantry and Couch" / "Overall System Test" / "Acquiring Calibration Data"), p.135-137
Personnel
Intermediate — run a test rotor from the KGTSM maintenance panel while visually checking three separate cover/mechanism interference points, verify a gantry-couch position interlock stops the system cleanly (cross-referencing subsection 28.7), operate gantry tilt/slide from the console keyboard and confirm the full ±30° tilt range, perform a ScanoPlan slice-plane check that involves taping solder wire to an S phantom, running scanoscopy/scan, and adjusting both an internal and an external projector until their beams align with the solder, read the OLP indication on the S-CON screen and confirm it is 20% or less before pressing all three emergency switches (two on the gantry, one on the keyboard) and confirming gantry power drops each time, and recognize the 3-hour post-power-on wait before starting calibration data acquisition (the acquisition procedure itself lives in section 28.8, not reproduced here). No electrical test equipment is called for beyond console operation and the phantom/solder setup. (Skill assessment derived from procedure content — not an OEM-stated skill level.)
Steps
14 steps
Source
2C201-160E*F p.135-137

Tools & parts

ItemPart numberQty
KGTSM maintenance paneln/a in source1 (built-in)
S phantomn/a in source1
Solder (piece/wire)n/a in sourcen/a in source
Internal projectorn/a in source1 (built-in)
External projectorn/a in source1
Water phantom + phantom holdern/a in source1

Safety

NOTICE

Hazard: Turning the power switch OFF while the X-ray tube is still hot (OLP above 20%), before confirming OLP during the operational check of the emergency switches (§22.3)

Consequence: The X-ray tube will not cool sufficiently, which may result in damage to the X-ray tube

Avoidance: Before starting operational checks of the emergency switches, confirm on the S-CON screen that the OLP is 20% or less. (Source labels this call-out CAUTION; reclassified NOTICE here — the only stated consequence is equipment damage to the X-ray tube, not personal injury.)

NOTICE

Hazard: Starting calibration data acquisition before waiting at least 3 hours after system power-ON for the detector to stabilize (§23)

Consequence: The acquired images may contain ring artifacts

Avoidance: Wait at least 3 hours after the power is turned ON to allow stabilization of the detector before performing calibration data acquisition. (Source labels this call-out CAUTION; reclassified NOTICE here — the only stated consequence is image/data quality, not personal injury or equipment damage.)

Full step-by-step for Final gantry-couch relationship check, system test and calibration data

All 14 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.