Pular para o conteúdo principal
InstallationGantry — Site installationInstall

Position, level and anchor the gantry

Drill the four anchor holes, level the gantry base to its punch marks with plumb bobs and graded shim stock, pull the shipping bracket, then torque and witness-mark the anchor bolts that lock the gantry to the floor for good.

Applies to
Aquilion 16 (TSX-101A) — Gantry, source volume 2C201-160 (Installation)
Personnel
1 technician · Intermediate — drilling four anchor bolt holes with care around the rotating drill bit, leveling the gantry base against punch marks with dual plumb bobs using graduated copper/brass shim stock (four shim sizes, up to three thicknesses each) until there is no gap between the base and the floor, then torquing the four anchor bolts to a specified 196 N·m and witness-marking them with steel paint for later inspection. No electrical test equipment is called out. (Skill assessment derived from procedure content — not an OEM-stated skill level.)
Steps
11 steps
Source
2C201-160E*F p.43-47

Tools & parts

ItemPart numberQty
Drilln/a in source1
Plumb bobn/a in source2
Shim — Shim 1n/a in source — see shim table, Step 6as needed
Shim — Shim 2n/a in source — see shim table, Step 6as needed
Shim — Shim 3n/a in source — see shim table, Step 6as needed
Shim — Shim 4n/a in source — see shim table, Step 6as needed
Anchor boltsn/a in source — supplied with the system4
Torque wrenchn/a in source — tool not named in this section; see the Installation Tool List, source §1.6, for the general torque-wrench range supplied with the system1
Steel paintn/a in sourcen/a in source

Safety

CAUTION

Hazard: Operating a drill to bore the four anchor bolt holes

Consequence: Getting caught by the rotating drill

Avoidance: Take care to avoid getting caught when drilling the anchor bolt holes

NOTICE

Hazard: Leaving a gap between the gantry base and the floor instead of shimming it out; source labels this call-out "CAUTION" — reclassified NOTICE here because the stated outcome is image quality, not personal injury

Consequence: Reduced contact between the gantry and the installation surface, which degrades image quality

Avoidance: Adjust the shim position so there is no gap between the gantry base and the floor, using the minimum number of shims needed for the adjustment

NOTICE

Hazard: Discarding the shipping bracket removed from the main frame instead of storing it; source labels this call-out "NOTE" — mapped to NOTICE, the closest Z535 signal word to a manufacturer NOTE

Consequence: The bracket is unavailable when it is needed again for disassembly or carrying the gantry back out

Avoidance: Store the removed bracket carefully — it will be reused for disassembly or carrying-out

Full step-by-step for Position, level and anchor the gantry

All 11 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related Gantry — Site installation guides

View all Aquilion 16 (TSX-101A) guides

Source: 2C201-160E*F p.43-47. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.