Checks and adjustments when replacing the X-ray tube
After a physical X-ray tube swap on the gantry, run the connection and operation check, trigger If adjustment, and step the new tube through its seven-stage aging (seasoning) exposure sequence — described here — before returning the Aquilion 16 to clinical use.
Tools & parts
| Item | Part number | Qty |
|---|---|---|
| XC maintenance program (or equivalent) | n/a in source | |
| Phantom | n/a in source |
Safety
Hazard: Bundling the power cable together with the signal cables when performing wiring again during this connection/operation check
Consequence: Not stated further in source beyond the instruction itself — reclassified here as NOTICE (equipment/wiring-practice concern) rather than source's own printed "CAUTION" label, per FSELIB convention that damage-to-equipment-only callouts are NOTICE-level; no personal-injury consequence is described for this item.
Avoidance: Do not bundle the power cable with the signal cables when performing wiring again.
Full step-by-step for Checks and adjustments when replacing the X-ray tube
All 6 steps are documented in the FSELIB Aquilion 16 (TSX-101A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated X-ray & HV (X-ray tube) guides
Source: 2D201-064E*H p.62-63. Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.