17CPU BOX connector pinouts (VOICE, XC-GTS, FC-AL, SCONT1/2, keyboards, monitor)
Start free trial →20How this console manual is organized and the TSX-101A service-manual set
Start free trial →40Remove and install the patient couch upper covers (handle, front, rear, side, rail, maintenance, couch-top bottom, and frame bottom covers)
Start free trial →44Adjust the Horizontal (Slide) Motion Speed - Servo Amplifier Parameters
Start free trial →49Patient couch service safety precautions (signal words, DANGER/WARNING/CAUTION, ESD)
Start free trial →51Longitudinal (Slide) Movement Drive Unit and Couch-Top Moving Frame - Theory
Start free trial →54Patient Couch Vertical Movement Mechanism and Hydraulic Drive — Theory of Operation
Start free trial →55Partially disassemble the patient couch for carrying-in (narrow route)
Start free trial →57Troubleshoot: slide stop accuracy, roller ride, rattle/sway, noise, and no in/out motion
Start free trial →61Lower the Patient Couch from a Raised Position After a Failure (200 VAC Jig)
Start free trial →69Converter-16 and Control-16 PWBs — architecture, DIP switches, LEDs, fan monitor
Start free trial →81Configure the detector temperature controller after replacement (AXC004-01 / -02)
Start free trial →87Diagnose integrator-, gain-, and slice-thickness-dependent abnormalities
Start free trial →136Gantry mechanism service safety precautions (signal words, DANGER/WARNING/CAUTION)
Start free trial →162Couch slide servo amplifier alarm codes and parameter list (CBTB-016A/016B)
Start free trial →163Couch slide servo amplifier operation and maintenance tool (CBTB-016A/016B)
Start free trial →173Patient couch sliding servo amplifier (CBTB-014A): operation and parameters
Start free trial →196Optical system operation: wedge and slit reference-position control and timeouts
Start free trial →209Final gantry-couch relationship check, system test and calibration data
Start free trial →229Secure the couch, install the footswitch, fit covers and set the height indicator
Start free trial →233System specifications, operating conditions and installation tool list
Start free trial →234Confirm console startup, check the audio system and set up the console software
Start free trial →235Carry the patient couch in tilted, on a triangular stand (narrow route or small elevator)
Start free trial →238Data acquisition system checks: temperature, connectors, line-voltage pins, fuses, fan, window — 4.1-4.6
Start free trial →239Data transfer unit operation and cleaning check (GCIFA PWB) — 5.1/5.2
Start free trial →240Whole-system image-quality tests: noise, CT number (TOS phantom), streak/artifact — 7.1-7.3
Start free trial →241Gantry mounting-bolt/screw tightening checks (items 1.1-1.24, paint-mark method)
Start free trial →242Interlock test method: outline, interlock positions and full interlock table — A.1-A.3
Start free trial →243Interlock test procedures: HEIGHT/TILT/SLIDE limits, tape/mat switches, auto-home, auto-set — A.4
Start free trial →244Couch-height, tilt-angle, rotation-speed and couch-movement-speed checks — 1.51-1.54
Start free trial →246Off-delay timer (X-ray tube cooling protection) setting and function check — 1.48
Start free trial →247Operating-panel and footswitch operation & switch-clearance checks — 1.46/1.47
Start free trial →248Clean dome internal-projector window and check Mylar ring mounting — 1.34
Start free trial →249Clean gantry photo-sensors (rotation, wedge, slit, rotational-direction detectors) — 1.25
Start free trial →250Positioning projector lamp: replacement, cleaning and internal/external/median alignment — 1.33
Start free trial →251Slit operation check (slice/slit width table) and wedge slide check & lubrication — 1.27/1.28
Start free trial →253Couch cable, movement-accuracy, free-operation, interlock and limit checks — 2.6-2.11
Start free trial →254Couch hydraulic leakage, lubrication, tightening, natural-fall, DC power and sensor checks — 2.12-2.19
Start free trial →255Patient couch cleaning, headrest and horizontal-belt tension checks — 2.1-2.5
Start free trial →256X-ray HV: XC battery, charge/discharge, starter output, cables, SRU bolts, tube bellows — 3.14-3.19
Start free trial →257X-ray output electrical checks: kV/mA, tube-current waveform, exposure time, line voltage — 3.10-3.13
Start free trial →258X-ray tube/heat-exchanger leakage, rotor resistance and cooling-fan checks — 3.1-3.9
Start free trial →259Console cleaning, fans, PC input and DC power-supply checks — 6.1-6.11
Start free trial →260Periodic inspection schedule: full item list with 3M/6M/1Y/2Y intervals
Start free trial →262Gantry terminal-board looseness, screw/nut, cable and final cleaning checks — 1.55-1.58
Start free trial →263Before inspection: tools, workers, standard precautions, cleaning and disinfection
Start free trial →265Visual check of GTS unit and rotation servo unit interiors — 1.49/1.50
Start free trial →266Gantry safety-circuit operation checks via KGTSM (tilt/vertical/horizontal, runout, rotation error) — 1.38/1.39/1.40
Start free trial →268Gantry servicing access and safety (cover open, rotation lock, supporting poles)
Start free trial →269Maintenance safety precautions: signal words, electrical, laser, slipring and rotation hazards
Start free trial →274Tilt power cylinder and gas spring abnormal-sound/oil-leak check — 1.26
Start free trial →276Back up, restore and format site information on MO with the Backup Tool
Start free trial →278Enable temporary 8-/16-slice conventional scan with the ExtendSeg command
Start free trial →282Check X-ray output with the DCA (acquisition, mean calculation, graph)
Start free trial →284Configure DICOM connectivity: hosts, services, transfer syntax, timeouts, language
Start free trial →291Initialize the image disk (via supplied CD-ROM or Windows Disk Manager)
Start free trial →292Set up an imager (DICOM or Toshiba protocol) with the Setup Utility preset tool
Start free trial →293Examination Scheduler Initial Setting screens (1 and 2) field reference
Start free trial →294Initialize the system: model/tube setup, special config, RDD/RAID, host name
Start free trial →295MOD service reference: mount, unmount and format the magneto-optical drive
Start free trial →296Acquire NRA and air calibration data (setup, procedure, flow, deletion)
Start free trial →298CT software architecture, login accounts, disk partitions and service media
Start free trial →299Configure CSV output, Tag Setup, Summary Output, LMDB List and MPPS tag definition
Start free trial →300Software installation overview: methods 1/2/3, required media, site backup
Start free trial →302System Setup utility: model/tube/HFG selection at install and after hardware change
Start free trial →307Install the system software from CD-ROM (boot, format, Windows 2000 setup)
Start free trial →308Configure the TOSHIBA (Xlink) protocol network between consoles and peers
Start free trial →322Service notices: floating section, power cable and gantry-rotation precautions
Start free trial →323X-ray system safety precautions (signal words, DANGER/WARNING/CAUTION)
Start free trial →326Entire X-ray system: configuration, specifications and operating principle
Start free trial →331Error-cause identification flowchart (block test to isolate SRU/HV cable)
Start free trial →332Troubleshoot kV/mA output faults (Over mA, Under mA, HV overcurrent, Under kV)
Start free trial →335X-ray tube malfunctions troubleshooting and malfunction-code reference
Start free trial →340Troubleshoot XC operation, cable interlock and starter communication faults
Start free trial →341XC Maintenance Program: block test, exposure/running test, debug monitor and screens
Start free trial →346XC maintenance program: R-status bit map, error-status bits, and Detail-screen parameter values
Start free trial →