Adjust the X-ray tube alignment (front/rear and left/right)
Realign the X-ray tube on the rotation base after tube replacement or whenever beam position drifts out of tolerance. The task has two independent axes — front/rear and left/right — each measured through the alignment utility in the service manual's software volume and corrected mechanically with a dial gauge and the tube mounting plate's adjusting bolts. Do front/rear first, then left/right.
Tools & parts
| Item | Part number | Qty |
|---|---|---|
| Torque wrench | — | 1 |
| Yellow paint pen | — | 1 |
| Dial gauge | — | 1 |
| Pin phantom | — | 1 |
| Phantom holder | — | 1 |
Full step-by-step for Adjust the X-ray tube alignment (front/rear and left/right)
All 13 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated X-ray & HV guides
Source: 2D201-112EN*D §1.5.3 (pp.90–93) — Tube alignment (1.5.3.1 Outline, 1.5.3.2 Front/rear, 1.5.3.3 Left/right). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.