Connect the replacement X-ray tube and run the operation check
After the X-ray tube itself has been mechanically replaced (Volume 1 procedure), complete the electrical connection and operation check described here before returning the system to service: rewire the tube leads to the starter terminal block, confirm the XCS PWB tube-type setting, verify basic operation, then work through the If-adjustment / seasoning / alignment follow-on tasks.
Tools & parts
| Item | Part number | Qty |
|---|---|---|
| XCS PWB (in the AC/CONTROL unit) | n/a in source | 1 |
| X-ray tube unit (stationary unit) leads — White / Black / Orange | n/a in source | 1 |
| Starter terminal block TBS01 (pins 1 Red / 2 White / 3 Black) | n/a in source | 1 |
Safety
Hazard: Connecting the starter cables at X-ray tube replacement without checking the cable marker against the circuit diagrams
Consequence: Damage to the anode rotation mechanism
Avoidance: Refer to the circuit diagrams and check the marker placed on the cable to perform correct cable connection
Full step-by-step for Connect the replacement X-ray tube and run the operation check
All 3 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated X-ray Tube guides
Source: 2D201-113EN*J §1.10 'Replacing the X-ray Tube' preamble (p.66) + §1.10.1 'Connection and operation check' (p.67). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.