Pular para o conteúdo principal
ProcedureX-ray TubeSetup/CalCheck

Check the X-ray tube aging (warm-up and seasoning) schedule

Run the X-ray tube's aging exposure schedule from the console — either the warm-up or the seasoning sequence — and hold the system powered ON for a minimum 30-minute period afterward before stopping.

Applies to
Activion16 (TSX-031A) X-ray tube unit, aging performed from the console. Documented in the manual as the middle step of the 'Replacing the X-ray Tube' sequence (§1.10): connection/operation check (§1.10.1) → aging (§1.10.2, this atom) → If adjustment (§1.10.3). Source does not state any model- or revision-specific restriction for this section.
Steps
0 steps
Source
2D201-113EN*J §1.10.2 'X-ray tube aging' (p.68)

Full step-by-step for Check the X-ray tube aging (warm-up and seasoning) schedule

All 0 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related X-ray Tube guides

View all Activion16 (TSX-031A) guides

Source: 2D201-113EN*J §1.10.2 'X-ray tube aging' (p.68). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.