Installation Site Readiness Checklist (Sign-off)

Before you commit to an on-site DryStar 5300 installation date, complete and sign this one-page form to confirm the client's site actually meets the seven readiness conditions the manufacturer requires — and record who checked it and when.

Applies to
Drystar 5300, Type 5365/100 (source Chapter 11, "Installation Planning," Edition 1, Revision 9, 12-2007, form appended at the end of the chapter, document p.523) — the one-page "INSTALLATION SITE READINESS CHECKLIST" sign-off form a field service engineer (or product specialist) fills in and signs to confirm the site is ready before an on-site DryStar 5300 installation begins. It is the closing gate the Pre-Installation Planning Checklist's step 12 ("Confirm the installation readiness") points to as "Last Page."
Personnel
Basic — reading/writing and cross-checking. Fill in the header fields, walk the 7 printed line items in order against the sections each one cross-references, tick each "Okay" box only once you've actually confirmed that item, capture anything unusual under Remarks, and sign. No tools, measurements, or hands-on printer work happen on this page itself — it is the paperwork gate before the on-site installation starts.
Steps
9 steps
Source
DD+DIS348.05E — Drystar 5300, Installation Planning, Chapter 11, "INSTALLATION SITE READINESS CHECKLIST" (sign-off form appended at the end of the chapter, no section number of its own), Edition 1, Revision 9 (12-2007), document p.523 (the form's own footer prints "1", not the chapter-relative page count used elsewhere in Chapter 11)

Full step-by-step for Installation Site Readiness Checklist (Sign-off)

All 9 steps are documented in the FSELIB DryStar 5300 service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related Installation guides

View all DryStar 5300 guides

Source: DD+DIS348.05E — Drystar 5300, Installation Planning, Chapter 11, "INSTALLATION SITE READINESS CHECKLIST" (sign-off form appended at the end of the chapter, no section number of its own), Edition 1, Revision 9 (12-2007), document p.523 (the form's own footer prints "1", not the chapter-relative page count used elsewhere in Chapter 11). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.