Installation Prerequisites, Positioning and Cable Connection
Work through the DryStar 5300's seven pre-installation checks and setup-start tasks — site and power readiness, shipment completeness, positioning, transport-lock removal, and cable connection — logging the time spent under installation-report task code INS.
Tools & parts
| Item | Part number | Qty |
|---|---|---|
| Chinese warning label | n/a in source | 1 |
Safety
Hazard: Lifting the 52 kg (115 lb) printer off the pallet
Consequence: Possible injury to personnel
Avoidance: Use two people to lift the printer from the pallet
Full step-by-step for Installation Prerequisites, Positioning and Cable Connection
All 11 steps are documented in the FSELIB DryStar 5300 service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated Installation guides
Source: DD+DIS346.05E — Drystar 5300, Controls, Connections and Set Up Procedures, Chapter 1, §2 "Installation Prerequisites" (§2.1-2.7), Edition 1, Revision 10 (2006-01-26), document p.39-42 (chapter-relative footers "Chapter 1/7" through "Chapter 1/10"). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.