Work this 12-item master checklist before you ever pack the truck for a DryStar 5300 installation — each item names what to get familiar with or check, why it matters, and exactly which section of this Installation Planning chapter (Chapter 11) covers it, so nothing about the site, network, or environment surprises you on arrival.
Applies to
Drystar 5300, Type 5365/100 (source Chapter 11, "Installation Planning," Edition 1, Revision 9, 12-2007) — the master 12-step checklist a field service engineer works through before starting an on-site installation of the printer. It is a planning/reading gate, not a hands-on procedure on the printer itself, and it opens the chapter every other Chapter 11 section belongs to.
Personnel
Basic — reading comprehension and cross-referencing the printer's own documentation set (system overview, scope of delivery, accessories, dimensions/clearances, network and modality parameters, ambient/electrical prerequisites, printer specifications, safety standards) and confirming each is satisfied before the site visit. No tools, measurements, or hands-on printer work happen on this page itself.
Source: DD+DIS348.05E — Drystar 5300, Installation Planning, Chapter 11, §1 "Installation Planning Checklist", Edition 1, Revision 9 (12-2007), document p.500 (chapter-relative footer "Chapter 11/6"). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.