Pular para o conteúdo principal
ProcedureDASFunctional ChecksCheck

Check the DAS supply voltage (AJ-CONTROL / AJ-CONVERTER PWBs)

Verify the DC supply voltages the DAS power supply unit delivers to the AJ-CONVERTER and AJ-CONTROL PWBs through connectors PCN2 and PCN3, and check the ripple on those same voltages with an oscilloscope. This is a bench check with the power cable and I/O cable already connected — you are reading supply rails at the board connectors, not commanding a scan.

Applies to
Activion16 (TSX-031A), CDAS-035A/2A data acquisition section (AJ-CONTROL / AJ-CONVERTER PWBs). No model- or revision-specific restriction beyond that generation is stated in source for this task; the CDAS-035A/1A generation has its own byte-identical-values procedure at §2.8.7 (Related), with Control-16/Converter-16 board names in place of AJ-CONTROL/AJ-CONVERTER.
Steps
3 steps
Source
2D201-113EN*J §2.16.7 'Check of the DAS supply voltage' (p.283)

Tools & parts

ItemPart numberQty
Digital voltmetern/a in source1
Oscilloscopen/a in source1
Power cablen/a in source1
I/O cablen/a in source1
AJ-CONVERTER PWBn/a in source1
AJ-CONTROL PWBn/a in source1
V.ADJ controlsn/a in sourcen/a

Full step-by-step for Check the DAS supply voltage (AJ-CONTROL / AJ-CONVERTER PWBs)

All 3 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related DAS guides

View all Activion16 (TSX-031A) guides

Source: 2D201-113EN*J §2.16.7 'Check of the DAS supply voltage' (p.283). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.