Check the X-ray generator power-on and power-off sequence

Confirm that turning the system (console) power ON and OFF drives the X-ray high-voltage section through its expected sequence: the smoothing capacitor charging and the main relay closing on power-ON, and the main relay opening, capacitor discharge starting, and (when the X-ray tube is hot) an automatic cooling-hold period on power-OFF.

Applies to
Activion16 (TSX-031A) X-ray generator, console-level power-on and power-off. Describes normal system behavior; no model- or option-specific restriction is stated in source for this section.
Steps
2 steps
Source
2D201-113EN*J §1.4.1 'Turning ON/OFF the power supply' (p.23)

Full step-by-step for Check the X-ray generator power-on and power-off sequence

All 2 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure

Related X-ray Generator/HV guides

View all Activion16 (TSX-031A) guides

Source: 2D201-113EN*J §1.4.1 'Turning ON/OFF the power supply' (p.23). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.