ProcedureX-ray Generator/HVFunctional ChecksCheck
Check the X-ray generator power-on and power-off sequence
Confirm that turning the system (console) power ON and OFF drives the X-ray high-voltage section through its expected sequence: the smoothing capacitor charging and the main relay closing on power-ON, and the main relay opening, capacitor discharge starting, and (when the X-ray tube is hot) an automatic cooling-hold period on power-OFF.
Applies to
Activion16 (TSX-031A) X-ray generator, console-level power-on and power-off. Describes normal system behavior; no model- or option-specific restriction is stated in source for this section.
Steps
2 steps
Source
2D201-113EN*J §1.4.1 'Turning ON/OFF the power supply' (p.23)
Full step-by-step for Check the X-ray generator power-on and power-off sequence
All 2 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.
Open the full procedureRelated X-ray Generator/HV guides
Adjust the If (filament) value remotely from the console31 stepsCheck the X-ray tube current with the tube ammeter (MA-1201D)4 stepsCheck the X-ray tube voltage with the tube voltage meter (kV-201 bleeder)5 stepsHandle the high-voltage cable — removal, cleaning, and silicone-oil reassembly (CLAYMOUNT)15 stepsReplace the X-ray generator fuse2 stepsRetrieve and decode the XC PWB error log (direct RS-232C read + system-software XL30 console log)11 steps
View all Activion16 (TSX-031A) guidesSource: 2D201-113EN*J §1.4.1 'Turning ON/OFF the power supply' (p.23). Preview re-authored by FSELIB — the full procedure with figures and steps is in the paid service manual.