Pular para o conteúdo principal
GE Healthcare · MR1316790260642

The Low Level Magnet Drift Z2 Shim Supply Has Reached the Extreme Lower End of its Range and Cannot Find Procedure to Re…

The Low Level Magnet Drift Z2 Shim Supply Has Reached the Extreme Lower End of its Range and Cannot Find Procedure to Re Zero it.

Symptom

The Low Level Magnet Drift Z2 Shim Supply Has Reached the Extreme Lower End of its Range and Cannot Find Procedure to Re Zero it See Long Description iTrak # mlength) obj.value=obj.value.substring(0,mlength) } function initMinimalEditor( fieldId ) { new Zapatec.MinimalEditor({field:fieldId, theme:'default',toolbarElements: ['fontName', 'fontSize', 'newPanel', 'bold', 'italic', 'underline', 'newPanel', 'foreColor', 'backColor', 'insertLink', 'insertImage','insertTable', 'newPanel', 'justifyLeft', 'justifyCenter', 'justifyRight', 'newPanel', 'insertOrderedList', 'insertUnorderedList', 'newPanel','copy', 'cut', 'paste', 'newPanel', 'outdent', 'indent', 'newPanel', 'undo', 'redo', 'newPanel', 'switcher']}); }--> 13167902 Ten months ago, this system installed FMI 60642 "SIGNA COIL REPLACEMENT FOR LOW LEVEL MAGNET DRIFT". Primary service is provided by an InHouse engineer who is an employee of the customer. Per the FMI, the Z2 supply was set to zero amps and the magnet was shimmed. The Z2 supply was set to decrement a small amount of current daily to follow the Z2 magnet drift. The system was turned back over to the InHouse engineer. After ten months had elapsed, the InHouse engineer found the Z2 supply had hit the lower end of its range (-2.00 Amp). This is normal and expected. It was now his task to "re-zero" the supply and reshim the magnet to allow another ten months of drift. This is where a problem was encountered: There is no procedure under revision control in documentation directing the re-zeroing of the supply, what must be done to accomplish this. The InHouse engineer placed a service call to the OnLine Center for direction.

Applies to

Product
Magnet LCC. Software Version Concept should NOT be selected for Magnet Products Serial #: 1.5T (Rxxx) / 1.0T (Qxxx) He Vessel Pressure:>3 psig but <5 psig Shield Temp:< 55 K Coldhead Temp:> 3.8K but < 4.5K Recondenser Temp:> 4.2K but < 4.55K Delta Temp (Coldhead - Recondensor):> 0 but < 0.3K Min. LHe Fill Level: 50% Min. LHe Ramp Level: 90% Min. LHe Shim Level: 75% Helium Volume:1940 L (1.5T) Helium Volume:1970 L (1.0T) Burst Disk <":2319285 Burst Disk >":2350415 Burst Disk O-ring:46-281101P1 Baffle Assy 2180818 Low Cryogen Consumption
Area
MR

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.