Pular para o conteúdo principal
GE Healthcare · MRSigna60642

How to short two pins together to check RRI Z2 Shim Power Supply Communication?

Symptom

How to check RRI Z2 Shim Power Supply Communication RRI power supply is used on Twinspeed or LX with FMI 60642. It is a resistive shim power supply that provides only one channel; Z2. The same supply is used as the High Order Shim Power Supply where multiple channels are provided. The system must have a BRM coil (or TRM) with resistive coil windings built in. Ordinary LX systems don't have one. See Long Description. Can't get the RRI (Z2) Shim Supply to communicate. To test communications from the host, the “cu” command can be used from a Cshell window as follows: cu shimsupply [enter]. If there's no response, there are two pins on cable Run 1004 connector at the shim supply that can be shorted together such that whatever is typed into the "cu" window will echo back. This will verify that everything up to the shim supply is working.

Applies to

Models
Signa
Product
Signa LX Signa LX Product can be used with 8.x and 9.x systems.
Software
9.1 For Signa LX product only
Area
MR

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare MR issues