Pular para o conteúdo principal
GE Healthcare · MR

Magnet policy in regards to hurricanes and other natural disasters.

Symptom

Magnet policy in regards to hurricanes and other natural disasters. What is the offical policy in regards to magnets being ramped up or down during a natural diaster?

Applies to

Product
Magnet 3T/940. Software Version Concept should NOT be selected for Magnet Products Field strength: 3.0 T LHe Boiloff Rate:< 0.13 liters/hr Min. LHe Fill Level:61.19% (500mm) Min. LHe Shim Level:90% (1040mm) Min. LHe Ramp Level:100% (1200mm) Helium Volume: 3066 Liters Burst Disk:2255516 RGD-5100 Coldhead Assembly:2255528
Area
MR

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare MR issues