Cabinet Monitor Line Fuse Blown on Initial Powerup of System due to PDU Input Voltage Improperly Set.

Symptom

HDe System Cabinet Will Not Power On Completely See Long Description Power was applied to HDe during install without first checking the PDU transformer strapping. Transformers are shipped with straps set for 200V. 480V was applied to system. The fuses in the MDC opened. After replacing those fuses the only thing that would power up in the system cabinet was the MGD chassis.

Applies to

Models
Excite
Product
Excite HDe. For Hino HDe 14.0 and HDe 15.0 Software Systems only
Software
HDe 15.0 For Hino Excite HDe 15.0 systems only.