GE Healthcare · MRSignaExciteDiscoveryOptima200002372200002
CWA Cannot Boot Applications with Host Monitor Timeout Error.
Symptom
Cannot Boot Applications with Host Monitor Timeout Error
Error message
200002372 The Process RTIA Took too Long to Start Up Fri Apr 23 06:28:06 2004 Error: 200002 372 Host: twin-mr1 Process: host Monitor File: ssProcStart.c Line: 904 The process RTIA took too long to start up. Hostmonitor Timeout after 650 Seconds See Long Description This message appears to the operator in the form of a popup box while (unsuccessfully) attempting to boot applications software. This error message does not get logged anywhere on the system.
Applies to
- Models
- Signa, Excite, Discovery, Optima
- Product
- Signa LX Signa LX Product can be used with 8.x and 9.x systems.
- Software
- 9.1 For Signa LX product only
- Area
- MR
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare MR issues
- Running grafidy3, and find there are spikes on the waveforms in the manual prescan display, both windows.
- TPS/MGD fails to download or reset. mgd_term windows fail to mount file system.
- Fails to Scan with TORSO Coil.
- The Carriage Fails to Advance to Latch to the Table and to Retract When it is Raised, Undocked or Lowered.
- AE title has changed on destination host.
- Unable to Load Applications Software during restoreinfo Due to Corrupt saveinfo Disk.