Pular para o conteúdo principal
GE Healthcare · X-ray R&F22895692273022

The Tomo will test / verify sweep but will not start sweep or exp during actual exposure request

Symptom

Install Ribbon Cable between System I/F Board and Tomolink I/F Board See Long Description Install the ribbon cable between the TomoLink I/F Board and the System I/F Board. Tomo-Link Upgrade Assy for Proteus XR/a System Dir 2289569-100 Rev0 on the schematic on page 3-1, and in the Proteus SM Dir 2273022-100 Rev17 schematic on page 10-21. It does show that a 25 pin cable (P/N: 221-2734) does/should exist between the TomoLink I/F Board on connector P2 and the System I/F Board on connector J115.

The Tomo will test / verify sweep but will not start sweep or exp during actual exposure request The Tomo will test/verify sweep but will not start sweep or exp during actual exposure request

Applies to

Product
PROTEUS XRa
Component
Tomolink
Area
X-ray R&F

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare X-ray R&F issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare X-ray R&F issues