SN 4835 INX100, Additional Handling Instructions For Pdu Ups Battery
Symptom
SN 4835 INX100, Additional Handling Instructions For Pdu Ups Battery Rev. 1 5323081-8EN 2 PURPOSE/SYMPTOM Shipping and transportation of equipments containing acid-lead batteries are subject to special rules defined by the U.S. Department of Transportation (DOT) and the International Air Transport Association (IATA) as the 49 CFR regulation. This regulation applies to systems intended to be shipped through US territories (by any transportation mean) or by airplane (worldwide). SN 4835 INX100, Additional Handling Instructions For Pdu Ups Battery Rev. 1 5323081-8EN 2 PURPOSE/SYMPTOM Shipping and transportation of equipments containing acid-lead batteries are subject to special rules defined by the U.S. Department of Transportation (DOT) and the International Air Transport Association (IATA) as the 49 CFR regulation. This regulation applies to systems intended to be shipped through US territories (by any transportation mean) or by airplane (worldwide). The purpose of this service note is to comply with this regulation. 3 PROBLEM The PDU contains an uninterruptible power supply (UPS) equipment which contains a pair of lead-acid batteries, therefore it must be shipped in accordance with the DOT/IATA 49 CFR regulation. That's why the batteries shall be disconnected before shipping and reconnected during installation. In case of battery replacement, the old battery shall be secured before shipment through the GE parts return circuit. 4 SOLUTION The service manual has been modified by Addendum 5318139-1-1EN to comply with the 49 CFR regulation. The procedures included in this addendum replace the procedures having the same ID from the "Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Service Manual", direction 5160409-9-2EN. Procedures REG0116 and CNF0142 have been created and procedures DR0231 / DR0171 / DR0170 / PM0032 / IST0064 have been updated to instruct the service engineer on how to handle the UPS batteries during the various service interventions. 5 PROCEDURE The new version of these procedures is available as a PDF file following the link below: http://gein.euro.med.ge.com/tech_publications/docs/doc/pdf/5318139-1-1EN_r1_O.pdf
Applies to
- Models
- Innova
- Product
- Innova X100 Monoplane Innova X100 Monoplane from product name Innova 2100, 3100 and 4100 Innova X100 Monoplane Innova 2100, 3100 and 4100 Innova X1 X1 Biplane Innova X1 X1 Bi-plane Innova 2121 or 3131 Bi-plane System Innova X1 X1 Bi-plane Innova 2121 or 3131 Bi-plane System
- Area
- X-ray Vascular
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy for this GE Healthcare X-ray Vascular issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare X-ray Vascular issues
- The Worklist does not refresh on the system when performing a query.
- Innova System boot failure
- INX1X; Message Limit switch engaged; LP4 Lateral Detector lift will not move after going to max SID using the Emergency Backout button on the lift cover because the lift hit maximum (Max) SID limit sw…
- Firewall is broadcasting DHCP addresses
- Cooling Failure; Shut System down and call Service is displayed on the Innova Image monitor
- No gantry motion is reported by the customer.