Pular para o conteúdo principal
GE Healthcare·🔬CT Scanner

VCT 64 Series Service Manual

Service Methods

Complete service documentation for VCT 64-slice CT scanners. This service manual covers installation, calibration, troubleshooting and maintenance procedures for the GE Healthcare VCT 64 Series.

Start free trial →

Access 509+ technical service manuals — 7-day free trial, no credit card required.

509+ manuals · 6+ manufacturers · CT, MRI, Mammography, X-Ray & more

Technical Specifications

ManufacturerGE Healthcare
Equipment TypeCT Scanner
Part Numbers
5116423-8005116410-1005272259-1EN2326492-4
Revision1

Table of Contents

From actual manual
1Pre-Installation
Sign in to access →
3Chapter 1 - Work Flow Overview
Sign in to access →
4Chapter 2 - Installation Summary
Sign in to access →
5Mechanical Installation Summary
Sign in to access →
6Electrical Installation Summary
Sign in to access →
7Chapter 3 - Position Subsystems
Sign in to access →
9Delivery and Console
Sign in to access →
10Gantry and Table
Sign in to access →
11Chapter 4 - Power, Ground, and Interconnect Cables
Sign in to access →
12Chapter 5 - System Continuity, Grounding, and Power Up
Sign in to access →
13Chapter 6 - Electrical Integration and Safety Verifications
Sign in to access →
14Chapter 7 - Calibration, Alignment, and Image Quality
Sign in to access →
15Chapter 8 - System Level Verification Tests
Sign in to access →
16Chapter 9 - Installation Finalization
Sign in to access →
22Align, Setup, Calibrations
Sign in to access →
24Console (GOC6.5)
Sign in to access →
25Console (GOC6)
Sign in to access →
26Console (GOC5)
Sign in to access →
29DAS and Detector
Sign in to access →
35Functional Checks
Sign in to access →
36Console GOC6
Sign in to access →
37Console GOC5
Sign in to access →
38Software (GOC6.5)
Sign in to access →
39Software Installation Procedures (LFC)
Sign in to access →
40HV Subsystem Utilities
Sign in to access →
41System Utilities
Sign in to access →
42Software GOC6
Sign in to access →
43Software GOC5
Sign in to access →
44LFC Related Procedures
Sign in to access →
45High Voltage Subsystem Utilities
Sign in to access →
47X-Ray Generation
Sign in to access →
48System Diagrams
Sign in to access →
49Troubleshooting
Sign in to access →
51Image Quality
Sign in to access →
53Replacements
Sign in to access →
56High Voltage
Sign in to access →
57ORP and TGPU
Sign in to access →
59Planned Maintenance and Tasks
Sign in to access →
60PM Data Reports
Sign in to access →
61Equipment Service - Console
Sign in to access →
62Equipment Service - Gantry
Sign in to access →
63Equipment Service - Gantry Lift Assembly Usage
Sign in to access →
64Important...X-Ray Protection
Sign in to access →
65Pre-Installation Manual: LS 7.X (5116410-100)
Sign in to access →
66Installation Forms
Sign in to access →
67Mechanical Installation Work Flow
Sign in to access →
68Electrical Installation Work Flow
Sign in to access →
69STEP 3B: Unload Console and Control Room Lean Cart
Sign in to access →
70STEP 5A: Install Operator Console, Peripherals, Hard Drives, etc.
Sign in to access →
71STEP 6: Transport Gantry to Scan Room
Sign in to access →
72STEP 7: Move Gantry Into Final Position
Sign in to access →
73STEP 8: Level the Gantry
Sign in to access →
74STEP 9A: Inspect the Gantry Bearing Gap
Sign in to access →
75STEP 9B: Install Gantry Alignment Laser and Bracket
Sign in to access →
76STEP 11: Align the Table to the Gantry
Sign in to access →
77STEP 16A: Console Cable Connections
Sign in to access →
78STEP 17A: Gantry Cable Connections
Sign in to access →
79STEP 18B: UPS Installation and Cable Connections
Sign in to access →
80STEP E2: System and Console Configuration
Sign in to access →

80 sections · Full content available after sign in

Related Manuals

💡 Community Contributions for this Model