GE Healthcare · MRSigna
EPT B0 Dither And B0 Image Won't Run.
Symptom
B0 Dither And B0 Image in EPT Fail To Complete See long description. After performing a restoreInfo, EPT Bo Dither and B0 Image tests will give an error: "EPT was unable to determine a PASS or FAIL status of the test". Both the "B0 Dither and the B0 Image" tests attempt to open the file /usr/g/caldir/ecmt.config and read the "warp_period" parameter. If the ecmt.config file does not exist, the tool tries to open /usr/g/caldir/grafidy.config to read the warp_period parameter.
Error message
EPT was Unable to Determine pass/fail Status of the Test
Applies to
- Models
- Signa
- Product
- Signa LX Signa LX Product can be used with 8.x and 9.x systems.
- Software
- 9.1 For Signa LX product only
- Area
- MR
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare MR issues
- Running grafidy3, and find there are spikes on the waveforms in the manual prescan display, both windows.
- Fails to Scan with TORSO Coil.
- The Carriage Fails to Advance to Latch to the Table and to Retract When it is Raised, Undocked or Lowered.
- AE title has changed on destination host.
- CWA ID100315. Auto and Manual Prescan Fails.
- What is the Acoustic Noise Level in the Ovation Magnet.