Inspector needs to know if the Gamatronics 3 phase UPS is a separately derived system as described in the NEC (National…
Inspector needs to know if the Gamatronics 3 phase UPS is a separately derived system as described in the NEC (National Electrical Code).
Symptom
Inspector needs to know if the Gamatronics 3 phase UPS is a separately derived system as described in the NEC (National Electrical Code). If the system was a separately derived system, the grounding would change for the UPS.
Applies to
- Product
- All NM Products General Nuclear Medicine products and options. All Nuclear Medicine Products - General Nuclear products and options
- Component
- *Power and Grounding Power and Grounding Includes: UPS types and service, P&P Audit procedures, P&P Troubleshooting Power and Grounding Includs UPS types Audit procedures Troubleshooting PQ Team Support Central: http://supportcentral.ge.com/products/sup_products.asp?prod_id=16313
- Area
- Nuclear Medicine
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare Nuclear Medicine issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare Nuclear Medicine issues
- Muga patch FMI 40788 when loaded does not indicate it completed
- How do I capture and print COR and Camera Uniformity (CUA) result screens on Genieacq, then send to a processing station for ACR
- Part number needed for Optima E-Stop
- Collision and E-stop lights are red on the back of the gantry and no movement with Hand Held Controller (HHC) or the genieacq.
- Service Note 43783_1 Feb/08 Infinia/Ventri/Xeleris 1.1 & 2
- Need part numbers for the Millennium MG/MC table E-Stop