GE Healthcare · CTLightSpeed26010100824454024463426010101850225260100073
LightSpeed 5.X (80/100kW)
Symptom
Scan aborts WITH Communications with the CCB sub-system has not been established. Scan aborts WITH Communications with the CCB sub-system has not been established
Error message
Error: 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive.Timeout value: 4000ms error 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive.Timeout value: 4000ms Open LD to see error example Error: 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive. Timeout value: 40000mS This was followed by Error: 244540 Immediate Request cannot be honored since the firmware is in the DOWN state. Error: 244634 Subsystem State; DCB:up, - CCB:down -, TCB:up, JEDI:up, TGP/ORP:up CCB Down See Long Description Tue Sep 19 07:18:46 2006 Error: 244634 Host: ct2y6 Process: fwmgr File: fwmgr_utils.c Line: 662 Function: No system function reported Scan Type: Not scanning Scan: 0/0/0 Scan Seq Id: 0 Subsystem State; DCB:up CCB:down TCB:up JEDI:up TGP/ORP:up. Error: 260101018 The CCB sub-system failed to return a respond to an ORP query message in the allotted time. see long description Host: orp Process: orp_subsys File: rcib_msg_reply.c Line: 590 Host : On-Board Rotating Processor Ermes # : 260101018 Exception Clas
Applies to
- Models
- LightSpeed
- Product
- LightSpeed 5.X (80/100kW) LightSpeed 5.X (80/100kW) ~ Use with both MDAS and GDAS ~ GRE Console HP_H_G16 HP_H_M16 HP_O_M16 LightSpeed 5.X (100kW) GDAS16 with GRE Links to the updated Product Service Manuals, FMIs, Service Notes, Option Manuals and Operator Documents can be found online at the attached sites. Always use the most appropriate documentation for your system.
- Component
- 2159578-3 collimator control board used on 1X/2X/3X/4X/5X See Long description for details Part #: 2159578-3 Part Type: GP CONSUMABLES Part Weight: 2.18 LBR Repairable: No Returnable: No Hazardous Material: N Description: COLLIMATOR CONTROL BOARD FRU: Yes Status: Orderable Comments: Not Available
- Area
- CT
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare CT issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required