Pular para o conteúdo principal
GE Healthcare · CTLightSpeed210000455

LightSpeed 5.X (60kW)

Symptom

Scout images fail to reconstruct. See long description for details Scout images fail to reconstruct. Rebooting, cycling console power, etc. does not help.

Error message

Error: 210000455 too long (79.157) seconds to install the image See Long Description for complete error. Fri Dec 22 08:23:58 2006 Error: 210000455 Host: ct05 Process: dms File: DMFInstall.cxx Line: 384 Error: it has taken too long (79.157) seconds to install the image. Our time limit is 45.000.

Applies to

Models
LightSpeed
Product
LightSpeed 5.X (60kW) LightSpeed 5.X (60kW) ~ Use with MDAS or GDAS HP_P_G4 HP_P_G8 HP_P_G16 HP_P_M16 LightSpeed 5.X 60KW G-DAS16 with GRE Links to the updated Product Service Manuals, FMIs, Service Notes, Option Manuals and Operator Documents can be found online at the attached sites. Always use the most appropriate documentation for your system.
Component
5117866-5 73 GB HDD used in HPxw8200 GRE. See Long Discription for Details. Part #: 5117866-5 Part Type: GP CONSUMABLES Part Weight: -139998.60 LBR Repairable: No Returnable: No Hazardous Material: N Description: 73 GB HDD for Lighting System Controller 5117866-2 FRU: Yes Status: Orderable
Area
CT

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare CT issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare CT issues