Pular para o conteúdo principal
GE Healthcare · Nuclear Medicine

Ventri NM Daily QC fails.

Symptom

Ventri NM Daily QC fails. Large energy peak shift observed on both detectors, and floods show all PMTs Ventri NM Daily QC fails. Large energy peak shift observed on both detectors, and floods show all PMTs. Unstable energy peak after front end calibartion. Front end calibrations were performed on both detectors, and acceptable QC results were obtained. However, both detectors were unstable afterwards with daily shifts in the Tc99m peak location observed. Figures 1 and 2 are the QC reports from the morning when the initial failure was reported. Figure 1. Detector 1 QC Results Figure 2. Detector 2 QC Results

Applies to

Product
Ventri Ventri Ventri
Component
UGP500115 Ventri DIB Board UGP500115 Ventri DIB Baord *Detector (Imaging Detector) *Detector (Imaging Detector) *Detector (Imaging Detector)
Area
Nuclear Medicine

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare Nuclear Medicine issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare Nuclear Medicine issues