Definium 5000 System will not completely power down when shutdown from the CRIB When the system is powered dow…
Definium 5000 System will not completely power down when shutdown from the CRIB
Symptom
Definium 5000 System will not completely power down when shutdown from the CRIB When the system is powered down from the CRIB by pressing the OFF button and holding for 5 seconds, the Magic PC will shut down and the display at the positioner will turn off but the collimator and parts of the positioner still have power. If the system is turned on at this state it will not power up correctly. Need to turn off wall breaker everytime the system is shutdown at the CRIB in order for it to power up correctly.
Applies to
- Models
- Definium
- Area
- X-ray R&F
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy for this GE Healthcare X-ray R&F issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare X-ray R&F issues
- AEC Backup Time message
- Definium 8000 Auto positioning does not work after a reset/reboot due to wall stand receptor at a hard limit during rebooting or repowering.
- Definium 8000 One or both monitors display the following message on every boot
- Definium 8000 Wallstand or Table Only Configurations running VolumeRAD M3 Software.
- Definium 8000 OTS Collimator has no power due to a tripped breaker (CB8) ont he Tube Suspension Logic (TSL) Board.
- Definium 8000 The Siemens Collimator has not power due to a tripped breaker (CB9) on the Tube Suspension Logic (TSL) Board.