Perform the checks after replacing the KGTSM PWB, servo amplifier, or servo motor

Whenever the KGTSM PWB, the servo amplifier, and/or the servo motor is replaced, work through the checklist below before returning the gantry to service. This page is the source's own index for that checklist — each item links out to the procedure or reference that actually carries it out, so you are not re-doing the detailed steps here, only confirming you have covered all of them.

Applies to
Activion16 (TSX-031A). No model/revision restriction is stated in source. The section title names both the KGTSM PWB and the rotation servo amplifier/motor, but the body on p.296 enumerates checks only under item (1) KGTSM PWB — no item (2) for the servo amplifier/motor appears on this page of the source; the equivalent servo-amplifier/motor replacement checks are given separately, in §3.7.3–3.7.6 (see Related).
Steps
0 steps
Source
2D201-112EN*D §3.9.1 (p.296) — Checks and adjustments after parts replacement (KGTSM and rotation servo amplifier)

Tools & parts

ItemPart numberQty
KGTSM PWB (gantry servo/motion control board)n/a in source
Rotation servo amplifiern/a in source
Rotation servo motorn/a in source

Full step-by-step for Perform the checks after replacing the KGTSM PWB, servo amplifier, or servo motor

All 0 steps are documented in the FSELIB Activion16 (TSX-031A) service manual — re-authored, web-first, with the real figures from the source.

Open the full procedure