Pular para o conteúdo principal
GE Healthcare · MR

All helium gas lines are not completely covered with the insulating tubing in the magnet room

Symptom

All helium gas lines are not completely covered with the insulating tubing in the magnet room.

Applies to

Product
Magnet LCC 300. Software Version Concept should NOT be selected for Magnet Products Low Cryogen Consumption Serial number:Wxxx Field strength: 3.0 T He Vessel Pressure:>3 psig but <5 psig Shield Temp:< 55 Kelvin Coldhead Temp:> 3.8K but < 4.5K Recondenser Temp:> 4.2K but < 4.55K Delta Temp (Coldhead - Recondensor):> 0 but < 0.3K Min. LHe Fill Level: 60% Min. LHe Ramp Level: 100% Min. LHe Shim Level: 80% Helium Volume:1735 Liters Burst Disk:2349529 Burst Disk O-ring:46-281101P1 Baffle Assy: 2180818 Shim Lead Large 5/8:2173354
Area
MR

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy for this GE Healthcare MR issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare MR issues