GE Healthcare · CTLightSpeedVCT24462160333244599
LightSpeed 5.X (60kW)
Symptom
Attention system detects an alignment or component change has been performed. After completing tube warm up- Attention system detects an alignment or component change has been performed.
Error message
Error: 244621 Timed out while attempting to receive a message. See long description for full error. Wed Aug 22 07:19:18 2007 Error: 244621 Host: mcc1 Process: fwmgr File: fwmgr fw if.cxx Line: 99 Function: No system function reported Scan Type: Not scanning Scan: 0/0/0 Scan Seq Id: 0 Did not receive reply from a request. Reply Event : 60333 Reply Source: rcib Error: Timed out while attempting to receive a message Error: 244599 Failure sending event 3295 using event router. See long description for sample error message. Fri Apr 2 07:52:58 2010 Error: 244599 Host: mob1 Process: fwmgr File: fwmgr oc if.c Line: 55 Function: No system function reported Scan Type: Not scanning Scan: 0/0/0 Scan Seq Id: 0 Failure sending event 3295 using event router. The event router received an event that had no primary receiver registered.
Applies to
- Models
- LightSpeed, VCT
- Product
- LightSpeed 5.X (60kW) LightSpeed 5.X (60kW) ~ Use with MDAS or GDAS HP_P_G4 HP_P_G8 HP_P_G16 HP_P_M16 LightSpeed 5.X 60KW G-DAS16 with GRE Links to the updated Product Service Manuals, FMIs, Service Notes, Option Manuals and Operator Documents can be found online at the attached sites. Always use the most appropriate documentation for your system.
- Area
- CT
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare CT issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required