GE Healthcare · CTLightSpeedVCT244634260101008244540
LightSpeed 5.X (60kW)
Symptom
Unable to scan with a message on screen that says: Collimator/DAS reset failed.
Error message
Error: 244634 Subsystem State; - DCB:down - CCB:up, TCB:up, JEDI:up, TGP/ORP:up, DEVICES:up GOC6 version DCB:DOWN See Long Description Wed Feb 17 23:30:55 2010 Error: 244634 Host: bay46 Process: fwmgr File: fwmgr_utils.c Line: 677 Function: No system function reported Scan Type: Not scanning Scan: 0/0/0 Scan Seq Id: 0 Subsystem State; DCB:down CCB:up TCB:up JEDI:up TGP/ORP:up DEVICES:up Error: 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive.Timeout value: 4000ms error 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive.Timeout value: 4000ms Open LD to see error example Error: 260101008 The ORP failed to connect with the CCB sub-system in the allotted time. Check to see if subsystem is alive. Timeout value: 40000mS This was followed by Error: 244540 Immediate Request cannot be honored since the firmware is in the DOWN state.
Applies to
- Models
- LightSpeed, VCT
- Product
- LightSpeed 5.X (60kW) LightSpeed 5.X (60kW) ~ Use with MDAS or GDAS HP_P_G4 HP_P_G8 HP_P_G16 HP_P_M16 LightSpeed 5.X 60KW G-DAS16 with GRE Links to the updated Product Service Manuals, FMIs, Service Notes, Option Manuals and Operator Documents can be found online at the attached sites. Always use the most appropriate documentation for your system.
- Area
- CT
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare CT issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required