Pular para o conteúdo principal
GE Healthcare · CTLightSpeed26010102250060

LightSpeed 5.X (80/100kW)

Symptom

Unable to scan with a message on screen that says: Collimator/DAS reset failed.

Error message

Error: 260101022 Communications between the CCB sub-system and ORP have been lost. See LD for more details Mon Apr 10 07:20:42 2006 Error: 260101022 Host: orp Process: orp subsys File: rcib init state.c Line: 267 Mon Apr 10 07:20:41 2006 Host : On-Board Rotating Processor Ermes # : 260101022 Exception Class : Abort Severity : Primary File : rcib init state.c Line# : 267 Function : No System Function Reported Scan Type : None/Unknown Scan: 50060/6/0 Communications between the CCB sub-system and ORP have been lost. Attempting to establish communications.

Applies to

Models
LightSpeed
Product
LightSpeed 5.X (80/100kW) LightSpeed 5.X (80/100kW) ~ Use with both MDAS and GDAS ~ GRE Console HP_H_G16 HP_H_M16 HP_O_M16 LightSpeed 5.X (100kW) GDAS16 with GRE Links to the updated Product Service Manuals, FMIs, Service Notes, Option Manuals and Operator Documents can be found online at the attached sites. Always use the most appropriate documentation for your system.
Component
2159578-3 collimator control board used on 1X/2X/3X/4X/5X See Long description for details Part #: 2159578-3 Part Type: GP CONSUMABLES Part Weight: 2.18 LBR Repairable: No Returnable: No Hazardous Material: N Description: COLLIMATOR CONTROL BOARD FRU: Yes Status: Orderable Comments: Not Available
Area
CT

Full cause & step-by-step resolution

The complete cause analysis, the step-by-step remedy and the attached service documents for this GE Healthcare CT issue are available to FSELIB subscribers — re-authored, web-first, searchable.

7-day free trial · no credit card required

Related GE Healthcare CT issues