Infinia MWL acquired study, the date and or time shows up wrong when transferd to PACS Study Time (0008,0030)…
Infinia MWL acquired study, the date and or time shows up wrong when transferd to PACS
Symptom
Infinia MWL acquired study, the date and or time shows up wrong when transferd to PACS Study Time (0008,0030) and Study Date (0008,0020) DICOM tags are not updated properly when Infinia uses modality worklist. The values of Study Date and Study Time get set to the values of the Scheduled Study Start Date (0032,1000) and Scheduled Study Start Time (0032,1001) tags received from the modality worklist provider. The Infinia software does not update Study Date and Study Time when the first acquisition takes place.
Applies to
- Models
- Infinia, Xeleris
- Product
- Infinia II Infinia II Acquisition System
- Software
- Infinia All Infinia All. Including Infina 1 and Infinia II. Infinia All. Including Infina 1 and Infinia II.
- Component
- *Software Software Software
- Area
- Nuclear Medicine
Full cause & step-by-step resolution
The complete cause analysis, the step-by-step remedy for this GE Healthcare Nuclear Medicine issue are available to FSELIB subscribers — re-authored, web-first, searchable.
7-day free trial · no credit card required
Related GE Healthcare Nuclear Medicine issues
- Service Note 43783_1 Feb/08 Infinia/Ventri/Xeleris 1.1 & 2
- Xeleris 1.1 DVD-RAMs do not always load back on to the same system that created them
- Unable to display or transfer Xeleris patient data.
- How to restore/install Entegra/Xeleris Aladdin protocols
- After software upgrade FMI40786, the Infinia application does not automatically start on boot up
- I need the product data sheet on catalog E4500AK x-ray in use warning light interface control panel for Infinia