Pular para o conteúdo principal
Siemens Healthineers·☢️X-Ray

Luminos Fusion Service Manual

Service Manual

Complete service documentation for Siemens Luminos Fusion radiography/fluoroscopy system. This service manual covers installation, calibration, troubleshooting and maintenance procedures for the Siemens Healthineers Luminos Fusion.

Start free trial →

Access 509+ technical service manuals — 7-day free trial, no credit card required.

509+ manuals · 6+ manufacturers · CT, MRI, Mammography, X-Ray & more

Technical Specifications

ManufacturerSiemens Healthineers
Equipment TypeX-Ray
Part Numbers
XPD3-380.80310569023108476101074670010094200100949101028101310502200
Models Covered
Luminos Fusion

Table of Contents

From actual manual
1Installation and Startup
Sign in to access →
2Installation Instructions
Sign in to access →
5Quality Assurance
Sign in to access →
6Installation Protocol
Sign in to access →
8Maintenance Instructions
Sign in to access →
9Maintenance Protocol
Sign in to access →
10Replacements of Parts
Sign in to access →
11Configuration
Sign in to access →
12Wiring Diagrams
Sign in to access →
14Troubleshooting Guide
Sign in to access →
15Replacement of Parts
Sign in to access →
17Questionnaire / Report Form
Sign in to access →
18Safety Information
Sign in to access →
19Disposal Instructions
Sign in to access →
20Planning Guide
Sign in to access →
21General Information
Sign in to access →
23Troubleshooting
Sign in to access →
24Remote Assist Workflow Examples
Sign in to access →
25Remote Session Initiation by the Moderator
Sign in to access →
26Enter session number at the system
Sign in to access →
27Moderator Guidance
Sign in to access →
28Moderator Control Request
Sign in to access →
29Moderator Acceptance of the Remote Control Request at the local System
Sign in to access →
30Third Participant Request by the Moderator
Sign in to access →
31Third Participant Acceptance of Access at the local System
Sign in to access →
32Changes to Previous Version
Sign in to access →
33beginning with Serial No. 10001
Sign in to access →
34Requirements/Remarks
Sign in to access →
35Requirements
Sign in to access →
36Installing the Luminos Fusion Unit
Sign in to access →
37Installing the Unit Base
Sign in to access →
38Converting the Transport Carriage
Sign in to access →
39Installing the Toothed Segment
Sign in to access →
40Installation of the 33 cm I.I.
Sign in to access →
41Installing the Image Intensifier on the Unit Support
Sign in to access →
42Installing the Unit Support on the Tilting Base
Sign in to access →
43Installing the Unit Support on the Unit Base
Sign in to access →
44Standing Up the Column
Sign in to access →
45Internal Unit Cabling
Sign in to access →
46Connect the cables of System Unit
Sign in to access →
47Injector Installation (Option)
Sign in to access →
48Installing the Monitors with the FL Compact
Sign in to access →
49Installing the Monitor Carriage
Sign in to access →
50Connecting the Remote Control Console Trolley
Sign in to access →
51System Control Console Installation
Sign in to access →
52FLUOROSPOT Compact
Sign in to access →
53FLUOROSPOT Compact (FL-C)
Sign in to access →
543D Telescope Installation
Sign in to access →
55Installing the Interface Boards in the Table Electronics Box
Sign in to access →
56Longitudinal Rail Installation
Sign in to access →
57Installing the Transverse Carriage on the 3D Telescope
Sign in to access →
58Installing the Transverse Carriage with 3D Telescope on the Longitudinal Rail
Sign in to access →
59D303 Board Cable Connections
Sign in to access →
60Positioning the Brakes (brakes on the transverse carriage and on the 3D telescope)
Sign in to access →
613D Park Position
Sign in to access →
62Install the switch strike spring for the park switch on the transverse rail on the 3D telescope.
Sign in to access →
63Stop Detent Installation
Sign in to access →
643D Telescope with Generator Cable Connections
Sign in to access →
65Installing the BWS (2nd Plane)
Sign in to access →
66BWS Installation Position
Sign in to access →
67Installing the BWS
Sign in to access →
68Cable Connections (2nd Plane with 3D Telescope Installation)
Sign in to access →
69Installing the BWS (3D Telescope is not selected)
Sign in to access →
70Cable Connections
Sign in to access →
71Installing the Generator
Sign in to access →
72KermaX (Option)
Sign in to access →
73DCS Assembly and Cabling (Option)
Sign in to access →
74Installation of the Longitudinal Rails
Sign in to access →
75Installation of the DCS
Sign in to access →
76Final Work Steps
Sign in to access →
77Installing the Cover Panels
Sign in to access →
78Laying the Zipper Hose
Sign in to access →
79Laying Cables and Installing Cover Panels
Sign in to access →
80Remaining Work Steps
Sign in to access →

80 sections · Full content available after sign in

Related Manuals

💡 Community Contributions for this Model